A commercial interior fit-out in Singapore typically costs from around S$80 per square foot for offices and from around S$180 per square foot for F&B, which works out to roughly S$20,000 to S$50,000 for a small office or retail unit, S$50,000 to S$150,000 for a mid-sized space, and S$150,000 upwards for large corporate, hospitality or multi-storey projects. Beyond budget, the thing that decides your timeline is approvals: which agencies you need to clear depends entirely on what you are changing, and that is where most commercial projects lose weeks.
This guide covers what a commercial interior designer actually does, what your project will cost, which approvals apply to your space type, and the end-of-lease obligation most tenants forget to budget for. Renodots matches you with vetted commercial firms in Singapore, free and with no obligation.

Commercial pricing is quoted per square foot far more often than as a lump sum, because fit-out scope varies so widely between a bare shell and an existing space being refreshed.
| Space type | Typical rate | Typical project range |
|---|---|---|
| Office fit-out | from ~S$80 psf | S$20,000 to S$150,000 |
| Retail unit | varies by shopfront and fixtures | S$20,000 to S$150,000 |
| F&B outlet | from ~S$180 psf | S$80,000 upwards |
| Large corporate, hotel, multi-storey | project-specific | S$150,000 to S$500,000 and above |
F&B costs more per square foot than any other commercial type because of kitchen exhaust, grease traps, gas, wet works, and the licensing that comes with them. An office of the same floor area can be a fraction of the cost.

How we calculated this: Based on commercial projects delivered through the Renodots network. Ranges are indicative, since commercial pricing depends heavily on base build condition, M&E scope and landlord requirements. For a figure specific to your space, request quotes and compare at least three.
This is the question that decides your programme. Different agencies govern different parts of the work, and the ones that apply depend on what you are changing, not on how big the project is.
| Agency | When it applies |
|---|---|
| URA | Change of use, for example converting a shop unit to F&B or an office to a clinic. Also signage and shopfront alterations. |
| BCA | Structural works: removing or forming openings in structural walls, new mezzanines, slab penetrations, heavy loading. Submission must be made by a Qualified Person. |
| SCDF | Fire safety works: sprinklers, smoke detection, means of escape, fire-rated partitions. Plan approval before works, then a Fire Safety Certificate on completion. |
| NEA | Food shop licensing for F&B, kitchen exhaust and grease management, environmental health requirements. |
| PUB | Sanitary and drainage alterations, water service works. |
| Landlord and building management | Fit-out rules, permitted working hours, contractor accreditation, deposits, and the reinstatement clause in your lease. |
A straightforward office refresh with no structural or fire safety changes may need only landlord approval. Converting a retail unit into a restaurant can touch URA, SCDF, NEA and PUB at once. Establish which list applies before you sign a contractor, because the approval route drives the programme, not the build.
For any structural alteration, yes. Submissions to BCA must be made by a Qualified Person, meaning a registered architect or Professional Engineer. An interior designer cannot submit on your behalf. If a firm tells you otherwise, treat it as a warning sign.
Almost every commercial lease in Singapore requires you to return the unit to its original condition when you leave. That means stripping out the fit-out you just paid for: partitions, ceilings, flooring, wiring, and often making good the base build.
Reinstatement is a real, contractual cost, and it is routinely left out of fit-out budgets entirely. Two things to do before you commit:
Beyond aesthetics, a commercial designer manages the path from brief to handover:
Open layouts for collaboration balanced against quiet zones for focus. Ergonomic furniture and natural light for staff wellbeing. Increasingly, flexible layouts that accommodate hybrid attendance rather than a fixed desk per head.
Layout and lighting that guide customers through the space and hold attention at key displays. Shopfront and signage often require separate approval. Fixtures should allow merchandising to change without a rebuild.
The back of house drives the design. Kitchen layout, exhaust, grease management and cold storage set the constraints; the dining room works around them. Licensing runs in parallel with the build, so start it early.
Clinics, salons, co-working and gyms each carry their own requirements, from sanitary provision to sector licensing. Match with a firm that has delivered your specific type before, not just commercial work generally.
We match you based on your space type and the sectors a firm has actually delivered, not on who is available:
Tell us your space type, floor area, location and target opening date, and we will match you with firms that have delivered your project type before.
Request commercial quotes, free and with no obligation
Office fit-outs typically start from around S$80 per square foot and F&B from around S$180 per square foot. In project terms, expect roughly S$20,000 to S$50,000 for a small office or retail unit, S$50,000 to S$150,000 for a mid-sized commercial space, and S$150,000 upwards for large corporate, hospitality or multi-storey projects. F&B costs more per square foot because of kitchen exhaust, grease management, gas and wet works.
It depends on what you are changing. URA governs change of use and signage. BCA governs structural works and requires submission by a Qualified Person. SCDF governs fire safety works and issues the Fire Safety Certificate. NEA governs food shop licensing and kitchen exhaust for F&B. PUB governs sanitary and drainage alterations. Your landlord will also impose fit-out rules and a reinstatement obligation. A simple office refresh may need only landlord approval, while converting retail to F&B can touch four agencies at once.
Only if the work is structural. Removing or forming openings in structural walls, adding a mezzanine, or heavy loading all require a Qualified Person, meaning a registered architect or Professional Engineer, to make the BCA submission. An interior designer cannot submit structural plans. Non-structural fit-out work does not require a QP.
Reinstatement is the lease obligation to return the unit to its original condition when you vacate, which usually means stripping out partitions, ceilings, flooring and wiring, and making good the base build. It is a contractual cost that most tenants leave out of the fit-out budget. Read the reinstatement clause before design begins, and ask your designer to price it alongside the fit-out, because design choices materially change what it costs.
The build itself is rarely the constraint. Approvals are. A fit-out with no structural, fire safety or change-of-use component can move quickly on landlord approval alone. A project touching URA change of use, SCDF plan approval and NEA licensing needs those running in parallel from the start. Confirm the approval route with your designer before fixing an opening date.
No. Matching is free for businesses, with no obligation to engage any firm we introduce. Renodots is funded by a referral fee paid by the design firms, not by you.