Getting the keys is the easy part. The next four weeks decide whether your renovation goes smoothly or becomes the story you warn friends about. This guide walks through what HDB actually requires, what a Singapore renovation costs in 2026, and how to spot a contractor worth trusting, before any deposit changes hands.
A renovation in Singapore costs S$25,000 to S$95,000 for most HDB flats in 2026 (4-room BTO: S$40,000 to S$62,000; resale adds 20 to 30 per cent), takes 8 to 14 weeks of works, and must be done by an HDB DRC-listed contractor. Verify CaseTrust accreditation before paying any deposit, and never pay more than 20 per cent upfront. Renodots matches you with three CaseTrust-verified designers for free: get your quotes here.
Most new owners pick a designer first. That is the wrong order, and it is the reason so many renovations go over budget. Work through these three questions first and the right designer becomes a much shorter list.
Two contractors quoting the same 4-room flat can land S$30,000 apart. The gap is rarely about who is cheating; it is about what each quote includes. Hacking, rewiring, waterproofing, debris removal, and material grade all sit behind very different line items.
Materials are running roughly 12 to 15 per cent above 2024 levels in 2026. Resale flats cost around 20 to 30 per cent more than equivalent BTOs because the work begins by undoing the previous home: old wiring, old pipes, popped tiles, dated waterproofing. Plan for that gap before signing anything.
Before you set a budget, it helps to know what your money can actually buy. Browse real completed projects in our HDB renovation gallery and check what was spent on each.
Mid-market ranges, averaged across Singapore contractor and ID firm quotes.
| Flat type | BTO range | Resale range | Typical works duration |
|---|---|---|---|
| 2-Room | S$15,400 to S$31,600 | S$28,100 to S$41,300 | 6 to 8 weeks |
| 3-Room | S$25,000 to S$45,000 | S$42,900 to S$66,600 | 8 to 10 weeks |
| 4-Room MOST COMMON | S$40,300 to S$62,300 | S$55,700 to S$80,400 | 8 to 12 weeks |
| 5-Room | S$44,700 to S$69,800 | S$64,300 to S$92,600 | 10 to 14 weeks |
| Executive / Maisonette | S$83,500 to S$118,200 | S$91,200 to S$134,800 | 12 to 16 weeks |
How we calculated this: Based on 212 renovation quotes submitted through Renodots between January and May 2026. Each range shows the 25th to 75th percentile, meaning the middle half of quotes we received. A quarter of homeowners were quoted less than the lower figure and a quarter were quoted more. Updated July 2026.
The table shows the market range. Tell us your flat type, size and scope, and 3 to 5 CaseTrust-accredited firms send you real quotes. Free, no obligation.
Resale flats almost always reveal something during hacking that nobody priced for , soft cement behind tiles, corroded pipework, water damage hidden under skirting. Keep 10 to 15 per cent of your budget aside specifically for these. If nothing comes up, you finish under budget. If something does, your renovation does not stall. Estimate your figure with our calculator →
HDB covers every new flat with a 1-year Defects Liability Period (DLP) from the date of key collection. Within that period, HDB's project contractor rectifies workmanship defects at no cost to you. The official guidance: report defects within 1 month of key collection, and ideally before renovation begins.
That timing matters. Once renovation starts, it becomes harder to prove a defect was already there. HDB notes that early reporting avoids the need to investigate whether defects were inherent or caused by renovation works. The flat is also empty and well-lit, which is the easiest time to spot anything.
The checklist below is for walking the flat room by room. Tick as you go, your progress saves in your browser so you can finish over multiple visits.
A torchlight for cabinet interiors, a small mirror for looking behind toilet bowls, a phone charger to test every socket, painter's tape and a marker to flag defects on the spot, and a marble for the floor-level test. Many homeowners also pay for a professional defect inspection at around S$300 to S$600; for a BTO, that fee usually pays for itself in the issues a trained eye catches.
HDB renovation is one of the most regulated home renovation environments in the region. Most rules exist because the building above and below yours shares your structure, drainage and wiring, so what you change in one flat can affect 30 others. Before you sign any quote, check the contractor against HDB's Directory of Renovation Contractors (DRC).
Hiring outside the DRC carries real consequences. HDB requires only DRC-listed contractors to carry out HDB flat renovation, and contractors face a demerit-point system that can lead to delisting. If a non-DRC contractor performs unauthorised work on your flat, the rectification cost falls on you, not them.
Looking for design direction first? Browse our HDB design gallery, compare BTO renovation packages, or check current bank rates in our renovation loan guide.
Renovating a terrace, semi-detached or bungalow follows an entirely different process from HDB. Instead of a renovation permit, you are working with two regulators: URA for planning permission, and BCA for building plan approval. Both submissions go through a Qualified Person (QP), a registered architect or Professional Engineer , not directly through you or your contractor.
For Additions and Alterations (A&A) works, URA outlines the framework in its A&A guidelines for landed housing. Structural changes then require a separate BCA building plan submission signed off by your QP and a PE.
Plan for longer timelines. Approvals alone usually run 2 to 4 months on top of design and construction, and budgets typically start around S$120,000 for a light terrace refresh, climbing past S$500,000 for a full bungalow rebuild.
A contractor alone cannot legally submit your plans. Any structural alteration requires a registered Architect or PE on the submission. Skipping formal submission can void insurance and create real headaches at resale. Always verify your QP's registration with the Board of Architects (BOA) or Professional Engineers Board (PEB).
Renovation has consistently been among the most complained-about sectors in Singapore. CASE, the Consumers Association of Singapore, recorded 962 renovation complaints in 2024 alone. The two most common patterns are familiar: workmanship that does not match the contract, and contractors who collect deposits and then go quiet or close down.
CaseTrust accreditation was built to address exactly this. Accredited firms must purchase a deposit performance bond that protects your money if the company closes, use the CaseTrust Standard Renovation Contract with progressive payments and itemised pricing, and provide a 12-month workmanship warranty from completion.
CaseTrust is not a legal requirement. But it is the cleanest signal a Singapore renovation firm can offer that they have been audited on policies, communication, personnel and practices. The full list of accredited firms is published on case.org.sg.
That is exactly who we match you with. Every firm is accredited, and we publish the numbers so you can verify them yourself before you commit.
Marketing pages cannot prove a contractor is licensed or accredited. These are the actual government and CASE registries, go directly to them.
The actual works on an HDB flat run 8 to 14 weeks. But the full journey, from opening Pinterest for the first time to walking into your finished home, usually takes 6 to 9 months. Most regret stories trace back to the same source: starting the planning too late and rushing decisions you live with for the next decade.
If you have just been allocated a flat, you already have a clock running. Use it.